Elena AILLv0.8Chat Elena
HomeResearchResearch milestones
Evidence first
← Back to research
Research topic

Research milestones

Historical milestone labels and later phase gates, presented with their documented meaning and without converting project history into a success-only timeline.

1M milestone

The original public site names a completed 1M SenzaAdam milestone and treats it as historical benchmark context. The label remains historical until its exact unit is independently documented.

10M sample-fact streaming milestone

The run was configured with 10,000,000 sample facts and resumed earlier state, producing a cumulative 10,833,323 learned facts. These are fact counts, not a model parameter total. The original run PASS and later extended-suite overall FAIL are reported separately.

100M deferred

The original page says 100M was deferred after 10M rather than failed. This is historical roadmap language, not a current benchmark result.

F896 and F898

Later milestones include an explicit failed end-to-end audit and a narrower corrective validation. Both outcomes remain visible.

1M historical milestone

The 1M milestone is retained only as a historical reference. Its exact unit is not documented with sufficient certainty and is not described as parameters, learned facts, or sample facts.

Stage 7

HISTORICAL — “Stage 7 before public demo” is preserved as historical roadmap language, not as a current operational state.

100M

HISTORICAL LINEAGE — DEFERRED RUN. It is not presented as a completed benchmark, a currently scheduled objective, or a future promise.